The final investment decision for the Begónia Development Area, located in the Lower Congo sea basin, about 150 kilometers off the Angolan coast, has already been taken. The information is provided by ANPG, TotalEnergies and the partners in Bloco 17/06. The Begónia reservoir will be developed through five subsea wells (three for production and two for water injection), connected to the floating production, storage and offloading unit FPSO Pazflor, in production since 2011 in Block
![]()
